Project Description
Hearst North Field Soil Restoration project will eliminate the amount of synthetic leachate washed off from the field, and greatly reduce the watering needs of the field by 20%-30% with an estimated captured savings of over 250,000 gallons annually. The management methodology consists of covering the field with high quality compost, working the compost into the soil, and regularly applying a liquid compost brew to the turf.
