Project Description
The Strawberry Creek Ecological Stabilization Project was a student-initiated project to design and install ecologically-functional grade control structures for a degraded section of Strawberry Creek. In addition to increasing channel stability, this project was an ecological restoration effort to support local fish and riparian species by improving habitat conditions and planting native riparian vegetation.